page_url,page_updated,theme,metric_id,metric,unit,year,value,value_numeric,as_of,source,source_url,confidence,note https://report-ai.org/indexes/state-of-ai/state-of-ai-infrastructure-energy/,2026-11-11,infrastructure,nvidia_dc_revenue,Nvidia data-centre revenue,USD (fiscal year; FY ends late January),2024,$115.2B,115200000000,"FY2025 (Feb 2024–Jan 2025), reported 26 Feb 2025",Nvidia Q4 FY2025 results (8-K),https://www.sec.gov/Archives/edgar/data/1045810/000104581025000021/q4fy25cfocommentary.htm,MEDIUM,"Up 142% year on year. Nvidia's fiscal year ends in late January, so FY2025 is treated as calendar 2024. sec.gov not reachable from our environment; figure matches site page 968 and multiple secondary reports." https://report-ai.org/indexes/state-of-ai/state-of-ai-infrastructure-energy/,2026-11-11,infrastructure,nvidia_dc_revenue,Nvidia data-centre revenue,USD (fiscal year; FY ends late January),2025,$193.7B,193700000000,"FY2026 (Feb 2025–Jan 2026), reported 25 Feb 2026",Nvidia Q4 FY2026 results press release,https://seekingalpha.com/pr/20414347,MEDIUM,"Up 68%. Q4 FY2026 data-centre revenue was $62.3B (+75% YoY), of which ~$10.98B networking. Consistent across Seeking Alpha, Hartware, Verdict, ServeTheHome." https://report-ai.org/indexes/state-of-ai/state-of-ai-infrastructure-energy/,2026-11-11,infrastructure,nvidia_dc_revenue,Nvidia data-centre revenue,USD (fiscal year; FY ends late January),2026,$164.2B (to date),164200000000,"H1 FY2027 (Feb–Jul 2026), reported 26 Aug 2026",Nvidia Q1 FY2027 (21 May 2026) and Q2 FY2027 (26 Aug 2026) results,https://www.outlookbusiness.com/corporate/nvidia-quarter-results-revenue-profits-data-centre-chips-jensen-huang-ai-investment-risk,DERIVED,"DERIVED: $75.2B (Q1 FY2027, quarter to 26 Apr 2026, +92% YoY) + $89.0B (Q2 FY2027, quarter to 26 Jul 2026, +117% YoY) = $164.2B. Two quarters only. Q3 FY2027 (Aug–Oct 2026) results not yet reported at 11 Nov 2026; company guided total Q3 revenue to $108.0B ±2%, excluding China data-centre compute." https://report-ai.org/indexes/state-of-ai/state-of-ai-infrastructure-energy/,2026-11-11,infrastructure,nvidia_total_revenue,Nvidia total revenue,USD (fiscal year; FY ends late January),2024,$130.5B,130500000000,"FY2025 (Feb 2024–Jan 2025), reported 26 Feb 2025",Nvidia Q4 FY2025 results (8-K),https://www.sec.gov/Archives/edgar/data/1045810/000104581025000021/q4fy25cfocommentary.htm,MEDIUM,Up 114%. https://report-ai.org/indexes/state-of-ai/state-of-ai-infrastructure-energy/,2026-11-11,infrastructure,nvidia_total_revenue,Nvidia total revenue,USD (fiscal year; FY ends late January),2025,$215.9B,215900000000,"FY2026 (Feb 2025–Jan 2026), reported 25 Feb 2026",Nvidia Q4 FY2026 results press release,https://seekingalpha.com/pr/20414347,MEDIUM,Up 65%. Data centre was ~90% of revenue (193.7/215.9). https://report-ai.org/indexes/state-of-ai/state-of-ai-infrastructure-energy/,2026-11-11,infrastructure,nvidia_total_revenue,Nvidia total revenue,USD (fiscal year; FY ends late January),2026,$177.8B (to date),177800000000,"H1 FY2027 (Feb–Jul 2026), reported 26 Aug 2026",Nvidia Q1 and Q2 FY2027 results,https://www.iphoneincanada.ca/2026/08/27/nvidia-blows-past-expectations-with-96-2-billion-revenue-in-q2-2027/,DERIVED,"DERIVED: $81.6B (Q1 FY2027, +85% YoY) + $96.2B (Q2 FY2027, +106% YoY) = $177.8B. Q2 GAAP gross margin 75.0%; GAAP net income $59.7B." https://report-ai.org/indexes/state-of-ai/state-of-ai-infrastructure-energy/,2026-11-11,infrastructure,amd_dc_revenue,AMD Data Center segment revenue (EPYC CPUs + Instinct GPUs),USD (calendar year),2024,$12.6B,12600000000,"Calendar 2024, reported Feb 2025",AMD Q4 and FY2024 results,https://convergedigest.com/amds-data-center-momentum-fuels-record-growth-in-q4-and-2024/,MEDIUM,"Up 94%. Instinct accelerator sales exceeded $5B in 2024. Segment includes server CPUs, so it is not a pure AI-accelerator figure." https://report-ai.org/indexes/state-of-ai/state-of-ai-infrastructure-energy/,2026-11-11,infrastructure,amd_dc_revenue,AMD Data Center segment revenue (EPYC CPUs + Instinct GPUs),USD (calendar year),2025,$16.6B,16600000000,"Calendar 2025, reported Feb 2026",AMD Q4 and FY2025 results,https://ir.amd.com/news-events/press-releases/detail/1276/,MEDIUM,Up 32%. Q4 2025 segment revenue a record $5.4B. AMD did not break out full-year Instinct revenue. https://report-ai.org/indexes/state-of-ai/state-of-ai-infrastructure-energy/,2026-11-11,infrastructure,amd_dc_revenue,AMD Data Center segment revenue (EPYC CPUs + Instinct GPUs),USD (calendar year),2026,"$21.0B (Q1–Q3, to date)",21000000000,"Jan–Sep 2026, reported 3 Nov 2026","AMD Q1, Q2 and Q3 2026 results",https://www.sec.gov/Archives/edgar/data/0000002488/000000248826000188/q32026991.htm,DERIVED,"DERIVED: $5.8B (Q1, +57% YoY) + $6.7B (Q2, +107%) + $8.5B (Q3 = $8.546B, +97%, 64% of company revenue) = ~$21.0B, already above full-year 2025. First half (Q1+Q2) = $12.5B. Q3 growth attributed to EPYC and the launch of Instinct MI450. Q4 2026 total-revenue guidance ~$17B ±3%." https://report-ai.org/indexes/state-of-ai/state-of-ai-infrastructure-energy/,2026-11-11,infrastructure,broadcom_ai_revenue,Broadcom AI semiconductor revenue (custom XPUs + AI networking),USD (fiscal year; FY ends early November),2024,$12.2B,12200000000,"FY2024 (to ~3 Nov 2024), reported Dec 2024",Broadcom Q4 FY2024 earnings call,https://www.gurufocus.com/news/2632439/broadcom-inc-avgo-q4-2024-earnings-call-highlights-record-revenue-and-ai-growth-propel-strong-performance,MEDIUM,Up 220% from $3.8B in FY2023. https://report-ai.org/indexes/state-of-ai/state-of-ai-infrastructure-energy/,2026-11-11,infrastructure,broadcom_ai_revenue,Broadcom AI semiconductor revenue (custom XPUs + AI networking),USD (fiscal year; FY ends early November),2025,$20B,20000000000,"FY2025 (to ~2 Nov 2025), reported Dec 2025",Broadcom Q4 and FY2025 results,,MEDIUM,Q4 FY2025 AI revenue +74% YoY. Some reports give $19.9B. https://report-ai.org/indexes/state-of-ai/state-of-ai-infrastructure-energy/,2026-11-11,infrastructure,broadcom_ai_revenue,Broadcom AI semiconductor revenue (custom XPUs + AI networking),USD (fiscal year; FY ends early November),2026,"$35.9B (Q1–Q3, to date)",35900000000,"FY2026 Q1–Q3 (Nov 2025–2 Aug 2026), reported 2 Sep 2026","Broadcom Q1, Q2, Q3 FY2026 results (8-K exhibits)",https://www.sec.gov/Archives/edgar/data/0001730168/000173016826000076/avgo-08022026x8kxex99.htm,DERIVED,"DERIVED: $8.4B (Q1, +106%) + $10.8B (Q2, +143%) + $16.7B (Q3, +221%) = $35.9B. Q2+Q3 (Feb–Aug 2026) = $27.5B. Company guided Q4 AI revenue to $21.7B and FY2026 to ~$58B (a forecast, not an outcome); it gave FY2027 ~$115B and FY2028 ~$230B outlooks on the Q3 call. XPUs were 73% of Q3 AI revenue." https://report-ai.org/indexes/state-of-ai/state-of-ai-infrastructure-energy/,2026-11-11,infrastructure,nvidia_accelerator_share,Nvidia share of AI data-centre accelerator market,% (revenue unless stated),2024,,,,,,,"No consistent, citable 2024 revenue-share estimate found." https://report-ai.org/indexes/state-of-ai/state-of-ai-infrastructure-energy/,2026-11-11,infrastructure,nvidia_accelerator_share,Nvidia share of AI data-centre accelerator market,% (revenue unless stated),2025,,,,,,,A ~92% figure for 2025 attributed to IDC circulates only via a weak secondary site; not used. https://report-ai.org/indexes/state-of-ai/state-of-ai-infrastructure-energy/,2026-11-11,infrastructure,nvidia_accelerator_share,Nvidia share of AI data-centre accelerator market,% (revenue unless stated),2026,~85%,85,Mar 2026,"Morgan Stanley estimate, via secondary reporting",,CONTESTED,"Estimates differ by method: Morgan Stanley ~85% of AI processor revenue (custom ASICs >10%, AMD <5%); Oreate AI 80–85% by revenue (mid-2026); SemiAnalysis/Mercury ~86%; Bloomberg Intelligence 70–75% through 2030 (forecast). By units, TrendForce forecasts GPU-based systems at 69.7% and custom-ASIC systems at 27.8% of 2026 AI-server shipments (Jan 2026; ASIC shipments +44.6% vs +16.1% for GPUs) — site page 968. Jon Peddie's 94% is add-in-board GPUs (mostly gaming) and must not be quoted as AI share." https://report-ai.org/indexes/state-of-ai/state-of-ai-infrastructure-energy/,2026-11-11,infrastructure,ai_server_shipment_growth,Global AI server shipment growth,% year on year (units),2024,+46%,46,Reported 12 Feb 2025,TrendForce,https://www.trendforce.com/presscenter/news/20250212-12469.html,MEDIUM,"Outcome estimate, driven by Hopper systems for US and Chinese cloud providers." https://report-ai.org/indexes/state-of-ai/state-of-ai-infrastructure-energy/,2026-11-11,infrastructure,ai_server_shipment_growth,Global AI server shipment growth,% year on year (units),2025,,,,,,,Only TrendForce's Feb 2025 forecast (~+28%) found; no outcome estimate for 2025 located. Not shown to avoid comparing a forecast with an outcome. https://report-ai.org/indexes/state-of-ai/state-of-ai-infrastructure-energy/,2026-11-11,infrastructure,ai_server_shipment_growth,Global AI server shipment growth,% year on year (units),2026,+28.3% (forecast),28.3,20 Jan 2026,TrendForce,,MEDIUM,"Forecast, not outcome. Not comparable with the 2024 outcome." https://report-ai.org/indexes/state-of-ai/state-of-ai-infrastructure-energy/,2026-11-11,infrastructure,cowos_capacity,"TSMC CoWoS advanced-packaging capacity, year end",wafers per month,2024,"~35,000",35000,End-2024,TrendForce; SemiMedia (Feb 2025),https://www.semimedia.cc/18495.html,MEDIUM,"Earlier TrendForce estimates ranged 32,000–40,000; treat 35,000 as approximate." https://report-ai.org/indexes/state-of-ai/state-of-ai-infrastructure-energy/,2026-11-11,infrastructure,cowos_capacity,"TSMC CoWoS advanced-packaging capacity, year end",wafers per month,2025,"75,000–80,000",77500,Dec 2025,TrendForce,https://www.trendforce.com/news/2025/12/08/news-tsmcs-cowos-l-s-reportedly-fully-booked-osat-partners-step-up-with-ases-cowop-in-focus,MEDIUM,"num = midpoint of range. Industry sources, not TSMC disclosure." https://report-ai.org/indexes/state-of-ai/state-of-ai-infrastructure-energy/,2026-11-11,infrastructure,cowos_capacity,"TSMC CoWoS advanced-packaging capacity, year end",wafers per month,2026,"~120,000–130,000 (end-2026 target)",125000,Jun 2026,TrendForce,https://www.trendforce.com/news/2026/06/15/news-tsmc-cowos-supply-demand-gap-reportedly-seen-narrowing-from-20-to-10-by-end-2026-as-capacity-expands,MEDIUM,"A capacity target, not a measured year-end figure, hence yoy false. Site page 968 uses ~130,000. TrendForce sees the CoWoS supply-demand gap narrowing from ~20% to ~10% by end-2026; OSAT partners could add 50,000–60,000 wpm. Goldman Sachs projects ~227,500 wpm average in 2027 (forecast)." https://report-ai.org/indexes/state-of-ai/state-of-ai-infrastructure-energy/,2026-11-11,infrastructure,openai_compute_gw,"OpenAI available compute capacity, year end",GW,2024,0.6 GW,0.6,"End-2024, stated 18 Jan 2026","OpenAI CFO Sarah Friar, 'A business that scales with the value of intelligence'",https://openai.com/blog/a-business-that-scales-with-the-value-of-intelligence,MEDIUM,"Company statement relayed by Reuters, DCD, SiliconAngle; OpenAI page not opened. 2023: 0.2 GW." https://report-ai.org/indexes/state-of-ai/state-of-ai-infrastructure-energy/,2026-11-11,infrastructure,openai_compute_gw,"OpenAI available compute capacity, year end",GW,2025,~1.9 GW,1.9,"End-2025, stated 18 Jan 2026",OpenAI CFO Sarah Friar,https://openai.com/blog/a-business-that-scales-with-the-value-of-intelligence,MEDIUM,About 3x 2024 and ~9.5x 2023. https://report-ai.org/indexes/state-of-ai/state-of-ai-infrastructure-energy/,2026-11-11,infrastructure,openai_compute_gw,"OpenAI available compute capacity, year end",GW,2026,,,,,,,"No operating-capacity figure for 2026 found. OpenAI said in late April 2026 it had 'secured' 10 GW of US capacity (see openai_contracted_gw), which reporting reads as contracted, not live. Do not compare 10 GW with 1.9 GW." https://report-ai.org/indexes/state-of-ai/state-of-ai-infrastructure-energy/,2026-11-11,infrastructure,openai_contracted_gw,Stargate / OpenAI contracted or planned US capacity,GW,2024,,,,,,,Stargate was announced on 21 Jan 2025. https://report-ai.org/indexes/state-of-ai/state-of-ai-infrastructure-energy/,2026-11-11,infrastructure,openai_contracted_gw,Stargate / OpenAI contracted or planned US capacity,GW,2025,~7 GW planned; $400B+ committed,7,Sep 2025,OpenAI,https://openai.com/index/announcing-the-stargate-project/,MEDIUM,"Stargate launched Jan 2025 as a $500B, four-year private commitment ($100B immediately). Planned, not operating." https://report-ai.org/indexes/state-of-ai/state-of-ai-infrastructure-energy/,2026-11-11,infrastructure,openai_contracted_gw,Stargate / OpenAI contracted or planned US capacity,GW,2026,10 GW secured,10,Late Apr 2026,"OpenAI blog, via DatacenterDynamics and Bloomberg Law",https://www.datacenterdynamics.com/en/news/openai-claims-to-have-secured-10gw-of-ai-infrastructure-capacity-ahead-of-2029-target/,MEDIUM,"Reached ahead of a 2029 goal; ~3 GW contracted in the prior 90 days including a 2 GW Amazon deal. Contracted, not operating. OpenAI also stated a 30 GW-by-2030 plan (Apr 2026). Oracle reported leasing an additional 4.5 GW for OpenAI (Jul 2026)." https://report-ai.org/indexes/state-of-ai/state-of-ai-infrastructure-energy/,2026-11-11,infrastructure,stargate_abilene_operating,Stargate Abilene (Texas) operating IT power,MW,2024,,,,,,,Under construction; not operating. https://report-ai.org/indexes/state-of-ai/state-of-ai-infrastructure-energy/,2026-11-11,infrastructure,stargate_abilene_operating,Stargate Abilene (Texas) operating IT power,MW,2025,,,,,,,First buildings came online in 2025; no dated year-end MW estimate found. https://report-ai.org/indexes/state-of-ai/state-of-ai-infrastructure-energy/,2026-11-11,infrastructure,stargate_abilene_operating,Stargate Abilene (Texas) operating IT power,MW,2026,~421 MW IT (of ~1.2 GW planned),421,Late Jul 2026,Epoch AI data-centre satellite tracker,https://epoch.ai/blog/openai-stargate-where-the-us-sites-stand,MEDIUM,"Third-party estimate (~509,000 H100-equivalents), not a company disclosure. Epoch (5 Oct 2026 update) says 4 of 8 buildings were operating by mid-2026, with the rest expected around Nov 2026; projected completion Q4 2026. A planned 600 MW expansion was dropped in Mar 2026." https://report-ai.org/indexes/state-of-ai/state-of-ai-infrastructure-energy/,2026-11-11,infrastructure,gartner_dc_power_gw,Global data-centre power demand (capacity),GW,2024,,,,,,,No comparable Gartner 2024 figure found. https://report-ai.org/indexes/state-of-ai/state-of-ai-infrastructure-energy/,2026-11-11,infrastructure,gartner_dc_power_gw,Global data-centre power demand (capacity),GW,2025,104 GW,104,10 Jun 2026,Gartner,https://www.gartner.com/en/newsroom/press-releases/2026-06-10-gartner-says-data-center-electricity-demand-to-grow-26-percent-in-2026,MEDIUM,Estimate. https://report-ai.org/indexes/state-of-ai/state-of-ai-infrastructure-energy/,2026-11-11,infrastructure,gartner_dc_power_gw,Global data-centre power demand (capacity),GW,2026,132 GW (forecast),132,10 Jun 2026,Gartner,https://www.gartner.com/en/newsroom/press-releases/2026-06-10-gartner-says-data-center-electricity-demand-to-grow-26-percent-in-2026,MEDIUM,Forecast; Gartner projects 290 GW by 2030. JLL separately expects ~100 GW of new data centres 2026–2030 and ~200 GW global capacity by 2030 (different definition). https://report-ai.org/indexes/state-of-ai/state-of-ai-infrastructure-energy/,2026-11-11,infrastructure,na_dc_vacancy,North America primary-market data-centre vacancy (H1),% of inventory,2024,2.8%,2.8,H1 2024,CBRE North America Data Center Trends H1 2024,https://www.cbre.com/press-releases/north-american-data-center-vacancy-rates-hit-record-low-despite-significant-supply-growth,MEDIUM,Record low at the time; down from 3.3% in H1 2023. https://report-ai.org/indexes/state-of-ai/state-of-ai-infrastructure-energy/,2026-11-11,infrastructure,na_dc_vacancy,North America primary-market data-centre vacancy (H1),% of inventory,2025,1.6%,1.6,H1 2025,CBRE North America Data Center Trends H1 2025,https://www.cbre.com/insights/reports/north-america-data-center-trends-h1-2025,MEDIUM,"Record low; primary-market inventory 8,155 MW." https://report-ai.org/indexes/state-of-ai/state-of-ai-infrastructure-energy/,2026-11-11,infrastructure,na_dc_vacancy,North America primary-market data-centre vacancy (H1),% of inventory,2026,1.4%,1.4,H1 2026,CBRE North America Data Center Trends H1 2026,https://www.cbre.com/insights/books/north-america-data-center-trends-h1-2026,MEDIUM,"Record low; primary-market supply 10,903 MW (+33.7% YoY); pricing for 10 MW+ deployments +9.7% in H1. CBRE's primary-market set may have been revised between editions." https://report-ai.org/indexes/state-of-ai/state-of-ai-infrastructure-energy/,2026-11-11,infrastructure,na_dc_under_construction,North America primary-market data-centre capacity under construction (H1),MW,2024,"3,871.8 MW",3871.8,H1 2024,CBRE,https://www.cbre.com/press-releases/north-american-data-center-vacancy-rates-hit-record-low-despite-significant-supply-growth,MEDIUM,"Record at the time, +69% YoY." https://report-ai.org/indexes/state-of-ai/state-of-ai-infrastructure-energy/,2026-11-11,infrastructure,na_dc_under_construction,North America primary-market data-centre capacity under construction (H1),MW,2025,"5,242.5 MW",5242.5,H1 2025,CBRE,https://www.cbre.com/insights/reports/north-america-data-center-trends-h1-2025,MEDIUM,"Down from an H2 2024 peak of 6,350 MW; CBRE revised some series." https://report-ai.org/indexes/state-of-ai/state-of-ai-infrastructure-energy/,2026-11-11,infrastructure,na_dc_under_construction,North America primary-market data-centre capacity under construction (H1),MW,2026,"7,481 MW",7481,H1 2026,CBRE,https://www.cbre.com/insights/books/north-america-data-center-trends-h1-2026,MEDIUM,"Record. Atlanta overtook Northern Virginia for construction (2,882 MW). JLL's 66 GW 'under construction' for North America (H1 2026) uses a much broader scope and must not be compared with CBRE's primary-market figure." https://report-ai.org/indexes/state-of-ai/state-of-ai-infrastructure-energy/,2026-11-11,infrastructure,na_dc_preleased,Share of North America primary-market construction already preleased (H1),% of under-construction MW,2024,~80%,80,H1 2024,"CBRE, via Data Center Knowledge",https://datacenterknowledge.com/data-center-construction/data-center-vacancy-rate-hits-record-low-in-h1-2024-cbre,MEDIUM,Reported as 'nearly 80%'. https://report-ai.org/indexes/state-of-ai/state-of-ai-infrastructure-energy/,2026-11-11,infrastructure,na_dc_preleased,Share of North America primary-market construction already preleased (H1),% of under-construction MW,2025,74.3%,74.3,H1 2025,CBRE,https://www.cbre.com/insights/reports/north-america-data-center-trends-h1-2025,MEDIUM, https://report-ai.org/indexes/state-of-ai/state-of-ai-infrastructure-energy/,2026-11-11,infrastructure,na_dc_preleased,Share of North America primary-market construction already preleased (H1),% of under-construction MW,2026,80.4%,80.4,H1 2026,CBRE,https://www.cbre.com/press-releases/north-american-data-center-demand-continues-to-outpace-supply-despite-record-construction,MEDIUM, https://report-ai.org/indexes/state-of-ai/state-of-ai-infrastructure-energy/,2026-11-11,infrastructure,global_dc_electricity_iea,Global data-centre electricity consumption (IEA),TWh,2024,~415 TWh,415,Apr 2025 (Energy and AI),"IEA, Energy and AI",https://www.iea.org/reports/energy-and-ai,MEDIUM,About 1.5% of global electricity. iea.org not reachable from our environment. https://report-ai.org/indexes/state-of-ai/state-of-ai-infrastructure-energy/,2026-11-11,infrastructure,global_dc_electricity_iea,Global data-centre electricity consumption (IEA),TWh,2025,~485 TWh,485,Apr 2026 (Key Questions on Energy and AI),IEA,https://www.iea.org/reports/key-questions-on-energy-and-ai/executive-summary,CONTESTED,"IEA: ~485 TWh, up ~17% (some IEA material says almost 20%), with AI-focused data centres up ~50%. Gartner (Jun 2026) estimates 447 TWh for 2025. Boundary definitions differ. IEA central projection for 2030 revised from ~945 TWh (2025 edition, used on site page 93) to ~950 TWh (Apr 2026 update), just under 3% of global demand." https://report-ai.org/indexes/state-of-ai/state-of-ai-infrastructure-energy/,2026-11-11,infrastructure,global_dc_electricity_iea,Global data-centre electricity consumption (IEA),TWh,2026,,,,,,,No IEA 2026 data-centre estimate found; the IEA Electricity Mid-Year Update 2026 names data centres as a driver of 3.6% global demand growth in 2026 but we could not read a data-centre TWh figure. See gartner_dc_electricity for a 2026 forecast from a different source. https://report-ai.org/indexes/state-of-ai/state-of-ai-infrastructure-energy/,2026-11-11,infrastructure,gartner_dc_electricity,Global data-centre electricity consumption (Gartner),TWh,2024,,,,,,,Not in the June 2026 release. https://report-ai.org/indexes/state-of-ai/state-of-ai-infrastructure-energy/,2026-11-11,infrastructure,gartner_dc_electricity,Global data-centre electricity consumption (Gartner),TWh,2025,447 TWh,447,10 Jun 2026,Gartner,https://www.gartner.com/en/newsroom/press-releases/2026-06-10-gartner-says-data-center-electricity-demand-to-grow-26-percent-in-2026,MEDIUM,Estimate. Lower than IEA's ~485 TWh for the same year (see global_dc_electricity_iea). https://report-ai.org/indexes/state-of-ai/state-of-ai-infrastructure-energy/,2026-11-11,infrastructure,gartner_dc_electricity,Global data-centre electricity consumption (Gartner),TWh,2026,565 TWh (forecast),565,10 Jun 2026,Gartner,https://www.gartner.com/en/newsroom/press-releases/2026-06-10-gartner-says-data-center-electricity-demand-to-grow-26-percent-in-2026,MEDIUM,"Forecast, +26% on 2025. Gartner projects 702 TWh in 2027. Site page 93 says Gartner sees 1,200+ TWh by 2030; not re-verified here." https://report-ai.org/indexes/state-of-ai/state-of-ai-infrastructure-energy/,2026-11-11,infrastructure,ai_server_electricity,Electricity used by AI-optimised servers (Gartner),TWh,2024,,,,,,,Not found. https://report-ai.org/indexes/state-of-ai/state-of-ai-infrastructure-energy/,2026-11-11,infrastructure,ai_server_electricity,Electricity used by AI-optimised servers (Gartner),TWh,2025,95 TWh,95,10 Jun 2026,"Gartner, via Network World",https://www.networkworld.com/article/4193996/gartner-data-center-electricity-consumption-to-grow-26-in-2026.html,MEDIUM,Estimate. Conventional servers ~193 TWh in 2025. https://report-ai.org/indexes/state-of-ai/state-of-ai-infrastructure-energy/,2026-11-11,infrastructure,ai_server_electricity,Electricity used by AI-optimised servers (Gartner),TWh,2026,175 TWh (forecast),175,10 Jun 2026,Gartner,https://www.gartner.com/en/newsroom/press-releases/2026-06-10-gartner-says-data-center-electricity-demand-to-grow-26-percent-in-2026,MEDIUM,Forecast; ~31% of data-centre electricity. Gartner expects AI-optimised servers (258 TWh) to overtake conventional servers in 2027. IEA (2025) projects AI-accelerated server electricity growing ~30% a year vs ~9% for conventional servers (site page 93). https://report-ai.org/indexes/state-of-ai/state-of-ai-infrastructure-energy/,2026-11-11,infrastructure,us_dc_electricity,US data-centre electricity consumption,TWh (% of US electricity),2024,177–192 TWh (4–5%),,Feb 2026,"EPRI, Powering Intelligence 2026",https://esca.epri.com/products/3002034696/,MEDIUM,"Range. IEA (2025) put US data centres at ~180 TWh in 2024. LBNL (Dec 2024) put 2023 at 176 TWh, 4.4% of US electricity. Projections: LBNL 325–580 TWh by 2028 (6.7–12%); EPRI 380–790 TWh by 2030 (9–17%), 60% higher than EPRI's prior scenarios; peak 45–94 GW in 2030." https://report-ai.org/indexes/state-of-ai/state-of-ai-infrastructure-energy/,2026-11-11,infrastructure,us_dc_electricity,US data-centre electricity consumption,TWh (% of US electricity),2025,,,,,,,No measured 2025 US total found. https://report-ai.org/indexes/state-of-ai/state-of-ai-infrastructure-energy/,2026-11-11,infrastructure,us_dc_electricity,US data-centre electricity consumption,TWh (% of US electricity),2026,,,,,,,No 2026 US total found. https://report-ai.org/indexes/state-of-ai/state-of-ai-infrastructure-energy/,2026-11-11,infrastructure,google_dc_electricity,Google data-centre electricity consumption,TWh,2024,~30.6 TWh,30.6,2025 Environmental Report,"Google, via secondary reporting",,MEDIUM,Some sources give 30.8 TWh; difference is rounding or restatement. Total company electricity rose 27% in 2024. https://report-ai.org/indexes/state-of-ai/state-of-ai-infrastructure-energy/,2026-11-11,infrastructure,google_dc_electricity,Google data-centre electricity consumption,TWh,2025,~42 TWh,42,30 Jun 2026 (2026 Environmental Report),"Google, via S&P Global and DatacenterDynamics",https://www.datacenterdynamics.com/en/news/googles-electricity-use-grew-37-percent-in-2025-largest-annual-rise-to-date/,MEDIUM,"Data centres added ~11.8 TWh (+~39%); company total 43.6 TWh (+37%, largest annual rise), up >250% since 2019. 100% matched with renewable purchases (annual matching)." https://report-ai.org/indexes/state-of-ai/state-of-ai-infrastructure-energy/,2026-11-11,infrastructure,google_dc_electricity,Google data-centre electricity consumption,TWh,2026,,,,,,,Reported annually; 2026 figure due mid-2027. https://report-ai.org/indexes/state-of-ai/state-of-ai-infrastructure-energy/,2026-11-11,infrastructure,energy_per_prompt,Headline energy estimate for one AI text prompt,Wh per prompt,2024,~2.9 Wh (estimate),2.9,May 2024,"EPRI (widely cited ChatGPT-request estimate, derived from 2023 work)",,MEDIUM,Top-down estimate for an early GPT-4-era ChatGPT request; roughly 10x newer measurements. Not comparable with later figures. https://report-ai.org/indexes/state-of-ai/state-of-ai-infrastructure-energy/,2026-11-11,infrastructure,energy_per_prompt,Headline energy estimate for one AI text prompt,Wh per prompt,2025,0.24 Wh,0.24,Aug 2025,Google technical report (median Gemini text prompt),,MEDIUM,"Full-stack figure incl. idle capacity and data-centre overhead; chip-only 0.10 Wh. Google also reports 0.26 mL water and 0.03 gCO2e (market-based) per median prompt, and a 33x per-prompt energy reduction over 12 months. Sam Altman cited ~0.34 Wh per ChatGPT query (Jun 2025, no methodology); Epoch AI estimates ~0.3 Wh for GPT-4o." https://report-ai.org/indexes/state-of-ai/state-of-ai-infrastructure-energy/,2026-11-11,infrastructure,energy_per_prompt,Headline energy estimate for one AI text prompt,Wh per prompt,2026,0.31 Wh (median typical query),0.31,2026 (Joule),"Oviedo et al., Microsoft Research, Joule",https://www.microsoft.com/en-us/research/?p=1170806,MEDIUM,"Modelled estimate for optimised frontier-scale inference: median 0.31 Wh (IQR 0.16–0.60) for ~300-token responses; 3.91 Wh (IQR 2.15–7.05) for ~5,000-token reasoning responses (13x). Not a lifecycle assessment. No regulator requires per-query disclosure (as of Sep 2026)." https://report-ai.org/indexes/state-of-ai/state-of-ai-infrastructure-energy/,2026-11-11,infrastructure,google_water_consumption,Google (Alphabet) water consumption,billion US gallons,2024,~8.1B gallons,8.1,Derived from 2026 Environmental Report,Report AI calculation from Google figures,,DERIVED,DERIVED: 10.869B gallons / 1.34 = ~8.1B (2025 total divided by reported +34% growth). https://report-ai.org/indexes/state-of-ai/state-of-ai-infrastructure-energy/,2026-11-11,infrastructure,google_water_consumption,Google (Alphabet) water consumption,billion US gallons,2025,10.9B gallons,10.9,30 Jun 2026,"Alphabet FY2025 environmental indicators (10,869 million gallons)",https://sustainability.google/google-2026-environmental-report/,MEDIUM,"Up 34%, more than double 2021; data centres drove most of the increase. Company-wide total. Replenishment projects returned ~7.7B gallons, ~78% of 2025 freshwater consumption." https://report-ai.org/indexes/state-of-ai/state-of-ai-infrastructure-energy/,2026-11-11,infrastructure,google_water_consumption,Google (Alphabet) water consumption,billion US gallons,2026,,,,,,,Reported annually; due mid-2027. https://report-ai.org/indexes/state-of-ai/state-of-ai-infrastructure-energy/,2026-11-11,infrastructure,largest_tech_nuclear_deal,Largest tech-company nuclear power deal announced in the year,MW contracted (not yet delivered),2024,"835 MW (Microsoft–Constellation, Crane/TMI-1)",835,20 Sep 2024,"Constellation / Microsoft, via World Nuclear News",https://wnn.world-nuclear.org/articles/crane-clean-energy-centre-on-line-for-ahead-of-schedule-restart,MEDIUM,"20-year PPA to restart Three Mile Island Unit 1; restart now targeted for H2 2027 (originally 2028), backed by a $1B DOE loan. Google–Kairos (Oct 2024) was 500 MW of future SMRs." https://report-ai.org/indexes/state-of-ai/state-of-ai-infrastructure-energy/,2026-11-11,infrastructure,largest_tech_nuclear_deal,Largest tech-company nuclear power deal announced in the year,MW contracted (not yet delivered),2025,"1,920 MW (Amazon–Talen, Susquehanna)",1920,Jun 2025,"Talen Energy, via POWER Magazine and Utility Dive",https://www.powermag.com/talen-amazon-launch-18b-nuclear-ppa-a-grid-connected-ipp-model-for-the-data-center-era/,MEDIUM,"Front-of-meter PPA through 2042, ~$18B revenue to Talen; ramps from 840–1,200 MW in 2029 to 1,680–1,920 MW in 2032. Replaced a co-located deal after FERC's Nov 2024 rejection. Meta–Constellation Clinton (Jun 2025) was 1,121 MW from 2027." https://report-ai.org/indexes/state-of-ai/state-of-ai-infrastructure-energy/,2026-11-11,infrastructure,largest_tech_nuclear_deal,Largest tech-company nuclear power deal announced in the year,MW contracted (not yet delivered),2026,"6.6 GW (Meta–Vistra, TerraPower, Oklo)",6600,9 Jan 2026,"Meta, via Tom's Hardware and others",https://www.tomshardware.com/tech-industry/artificial-intelligence/meta-inks-deals-to-supply-a-staggering-6-gigawatts-in-nuclear-power-for-data-center-ambitions-enough-wattage-to-supply-5-million-homes,MEDIUM,"Up to 6.6 GW by 2035: 20-year contracts with three existing Vistra plants plus offtake from TerraPower and Oklo SMRs not yet built. Includes future capacity, so not like-for-like with single-plant deals; breakdowns by plant vary between sources." https://report-ai.org/indexes/state-of-ai/state-of-ai-infrastructure-energy/,2026-11-11,infrastructure,pjm_capacity_price,"PJM capacity auction clearing price (RTO), by year auction was held",USD per MW-day,2024,$269.92/MW-day (2025/26 delivery),269.92,Jul 2024 auction,PJM,https://insidelines.pjm.com/pjm-auction-procures-134311-mw-of-generation-resources-supply-responds-to-price-signal/,MEDIUM,"BGE and Dominion zones cleared higher ($466.35, $444.26)." https://report-ai.org/indexes/state-of-ai/state-of-ai-infrastructure-energy/,2026-11-11,infrastructure,pjm_capacity_price,"PJM capacity auction clearing price (RTO), by year auction was held",USD per MW-day,2025,"$329.17/MW-day (2026/27 delivery, at cap)",329.17,22 Jul 2025 auction,PJM,https://insidelines.pjm.com/pjm-auction-procures-134311-mw-of-generation-resources-supply-responds-to-price-signal/,MEDIUM,"+22%; total cost ~$16.1B. A second 2025 auction (Dec 2025, 2027/28 delivery) also cleared at its cap of $333.44." https://report-ai.org/indexes/state-of-ai/state-of-ai-infrastructure-energy/,2026-11-11,infrastructure,pjm_capacity_price,"PJM capacity auction clearing price (RTO), by year auction was held",USD per MW-day,2026,"$325/MW-day (2028/29 delivery, at cap)",325,14 Jul 2026 auction,"PJM, via Utility Dive and POWER Magazine",https://www.utilitydive.com/news/pjm-capacity-auction-price-cap-reserve-shortfall-grows/825282/,MEDIUM,"Third auction in a row at the cap. Uncapped simulated price ~$555/MW-day; procured capacity ~6,831 MW short of the reliability requirement; forecast peak up ~2,000 MW mostly from data centres. Market monitor attributes ~$6.3B of costs to data centres (monitor estimate)." https://report-ai.org/indexes/state-of-ai/state-of-ai-infrastructure-energy/,2026-11-11,infrastructure,h100_rental_price,Nvidia H100 rental price (neocloud / market),USD per GPU-hour,2024,~$2/GPU-hr (resale market),2.0,11 Oct 2024,"Eugene Cheah, Latent Space, '$2 H100s: How the GPU Rental Bubble Burst'",https://latent.space/p/gpu-bubble,MEDIUM,"Down from ~$8/hr in the 2023 shortage. Practitioner analysis of resale markets, not an index: break in series vs 2025–26." https://report-ai.org/indexes/state-of-ai/state-of-ai-infrastructure-energy/,2026-11-11,infrastructure,h100_rental_price,Nvidia H100 rental price (neocloud / market),USD per GPU-hour,2025,$2.00/GPU-hr (low),2.0,9 Dec 2025,Silicon Data H100 Rental Index (SDH100RT),https://www.silicondata.com/blog/h100-price-spike,MEDIUM,Index launched 27 May 2025; ~$2.36 in Jun 2025 and $2.22–2.26 in Aug 2025 (secondary reports). Silicon Data later revised its methodology; earlier levels may not be strictly comparable. silicondata.com not reachable from our environment. https://report-ai.org/indexes/state-of-ai/state-of-ai-infrastructure-energy/,2026-11-11,infrastructure,h100_rental_price,Nvidia H100 rental price (neocloud / market),USD per GPU-hour,2026,$2.88/GPU-hr,2.88,24 Oct 2026,"Silicon Data SDH100RT, via FourWeekMBA",https://fourweekmba.com/ai-patels-data-puts-nvidia-h100-rent-up-65-in-a-year-at-2-80/,MEDIUM,"Range $2.81–$2.97 from 7 Oct to 5 Nov 2026 (+5.7%). +44% from the Dec 2025 low (DERIVED: 2.88/2.00 − 1). SemiAnalysis one-year contract index rose from ~$1.70 (Oct 2025) to ~$2.35 (Mar 2026). On-demand list prices are higher (Uvik median $4.20, Oct 2026; Nebius raised to $4.50 on 1 Oct 2026). CME H100/B200 rental futures delayed to ~Jan 2027." https://report-ai.org/indexes/state-of-ai/state-of-ai-infrastructure-energy/,2026-11-11,infrastructure,nvidia_stargate_guarantee,Nvidia guarantee of debt for the Ohio (PORTS) Stargate site,USD,2024,,,,,,,Project announced Mar 2026. https://report-ai.org/indexes/state-of-ai/state-of-ai-infrastructure-energy/,2026-11-11,infrastructure,nvidia_stargate_guarantee,Nvidia guarantee of debt for the Ohio (PORTS) Stargate site,USD,2025,,,,,,,"Nvidia's Sep 2025 'up to $100B' OpenAI investment letter (tied to 10 GW) collapsed in Feb 2026, replaced by a $30B equity stake." https://report-ai.org/indexes/state-of-ai/state-of-ai-infrastructure-energy/,2026-11-11,infrastructure,nvidia_stargate_guarantee,Nvidia guarantee of debt for the Ohio (PORTS) Stargate site,USD,2026,up to $105B (cut from ~$250B),105000000000,Aug 2026,"WSJ, Reuters, Fortune (14–18 Aug 2026)",,MEDIUM,"Covers phase one (~5 GW) of a 10 GW, ~$500B campus with 9.2 GW of on-site gas generation; separate ~$350B of chip-purchase financing. Phase one (~800 MW) costed at $30–40B, due early 2028."